Project Bridge Of Cally

Project;

Location;

Contract duration;

Anchors Installed;

Area Treated;

Gabion mattress and supporting ground anchors

Bridge of Cally

10 Days

70 No. 6m long AS30 Duckbill Anchors

120m2

Remedial works to landslip undermining the A93 to Braemar in the Scottish Highlands

The aim of this project was to install remedial works comprising a gabion mattress and supporting ground anchors in an area where water damage had washed away existing gabions and the slope below undermining the road above.
A gabion mattress was installed by the main contractor to replace the land slipped material and protect the remaining slope. JTS were commissioned to install 3 columns of 6m long duckbill anchors to hold the gabion mattress in place.
The anchors were installed working up the slope from the bottom of the gabion mattress.

 